Access to the Library During Construction: Spring 2023 Update

Access to the Library's main entrance is now from the ramp located on the east side of the building, closest to the USU, between Magnolia and Sequoia Halls.

Detailed directions:

  1. From the Quad, facing the Library’s Grand Staircase, turn right, and go to the end of the Library Lawn.
  2. Turn left and go forward, past the Library Lawn and construction fencing, to the ramp on the left. 
  3. Turn left and go up the ramp to the Library portico, and the main entrance will be on the right.

Access to the Library's Lockers continues from the east-side portico, just north of the main entrance, heading toward Jacaranda Hall.

Access to UL 25 and other classrooms and offices located on the Lower (Lawn/Garden) Level is available from the doors on either side of the grand staircase.

Check Library Service Updates for upcoming changes related to construction.
 